Fabriqué en Europe · Production dès 1 pièceMade in Europe · Production from 1 pieceConseils, technique & inspirationTips, technique & inspirationDevis gratuitFree quote
AccueilHome›Blog›Phased delivery of a large order: rolling out kit in waves (500–10,000 pieces)
Grands comptes · 6

Phased delivery of a large order: rolling out kit in waves (500–10,000 pieces)

Recevoir 10 000 pièces d'un coup n'est pas toujours souhaitable. Voici comment organiser une livraison échelonnée, par vagues et sur demande, pour piloter la dotation d'une grosse commande.

Cartons d'une grosse commande de t-shirts de sport personnalisés sur une palette, préparés pour une livraison échelonnée par vagues

Receiving 10,000 pieces in one go isn't always what you want. Between storage, cash flow and your rollout schedule, a large order often works better delivered in waves. At FLARE CUSTOM, this phased delivery is available on request — here's how to organise it so you can pace your rollout without drowning in boxes.

Why not take everything at once

On an order of 500 to 10,000 pieces, a single delivery raises three very concrete problems:

  • Storage: several thousand pieces is a volume of pallets that a club, an association or even an agency doesn't always have room for.
  • Cash flow and use: if the rollout spans a season or several sites, tying up all the kit at once brings little benefit.
  • Getting quantities right: changing headcounts, new joiners, sizes to adjust… keeping part of the order in reserve avoids locking in a breakdown too early.

The common outcome of a single delivery: part of the stock sits in a storeroom for months while another part is already missing where it's needed.

How phased delivery works

The principle is simple: together, at the quote stage, we set a rollout schedule. Production is launched once your design is approved, then the pieces ship in waves on the agreed dates rather than in a single consignment. A buffer stock can be held at the workshop between waves — again, on request.

Each wave ships like a normal delivery: 6 working days across Europe, tracked. One key point: this isn't automatic, it's an option to request and to define in the quote. Flag it as soon as you request a quote so it's built into the schedule from the start.

Building your rollout schedule

Good phasing is prepared upstream. A few markers:

  • Map the milestones: sites to equip, events, restart dates, high points of the season. Each milestone becomes a wave.
  • Prioritise the first wave: staff, project leads, the pieces that need to be visible straight away. That's the one that has to be ready first.
  • Keep a reserve for replenishment and new joiners — that's the whole point of not releasing everything at once. Getting the size breakdown on a large order right helps size that reserve.
  • Work back from the earliest date: it's that date, not the last wave, that drives when production starts.

Plan for lead times: the crux of it

This is where phased projects are won or lost. Current lead time is 4 to 5 weeks of production after you approve your design, then delivery of each wave. With express production unavailable at the moment, everything rests on anticipation: far better to set the schedule early than to count on a last-minute rush. Our current lead times are kept up to date — check them before fixing the date of your first wave.

What sublimation and "from a single piece" change

Two strengths make phasing especially smooth with us:

  • European manufacturing (our workshop is in Bulgaria, in the EU) shortens the loop: replenishing or relaunching a wave stays simple, without depending on distant shipping.
  • Production from a single piece, no minimum: a wave can be small with no quantity penalty. You never have to bundle shipments artificially.

Another key point: with all-over sublimation, colours are infused into the fibre. From one wave to the next the result stays identical — no colour drift to fear between a first and a last delivery months apart. Logos and sponsors, meanwhile, remain unlimited and at no surcharge, whatever the wave.

Key takeaways

  • Phased delivery of a large order (500 to 10,000 pieces) is available on request, defined in the quote.
  • You set a rollout schedule: production is launched after approval, then pieces ship in waves on agreed dates.
  • Each wave is delivered within 6 working days in Europe, tracked; a buffer stock can be held between waves.
  • Allow 4 to 5 weeks of production after approval — express isn't available, so plan early.
  • European manufacturing, production from a single piece and all-over sublimation: easy replenishment and an identical result across waves.

Frequently asked questions

Can an order be delivered in several instalments?

Yes, on request. We set a rollout schedule together at the quote stage, and the pieces ship in waves on agreed dates rather than in a single consignment. Flag it when you enquire so it's built into the plan.

Is there a minimum number of pieces per wave?

No: production starts from a single piece, with no minimum, so a wave can be small. We simply set a coherent schedule so each shipment makes sense.

How long before the first wave arrives?

Currently allow 4 to 5 weeks of production after you approve your design, then delivery of the wave. With express unavailable at the moment, the safest approach is to set the schedule well in advance.

Request a quote with phased delivery

Un projet de maillots ou d'équipements ?

A jersey or kit project?

Devis gratuit sous 48 h, production dès 1 pièce.

Free quote within 48h, production from 1 piece.

Demander un devisRequest a quote← Tous les articles← All articles